Girls Ecofriendly One Piece Swimsuit Children Shoulder Strap Swimwear Kids UV Protection Beachwear

Customization: Available
Color: Flower
Material: Nylon

Product Description

01
Basic Information
Model NO.
GS24-04
Occasion
Swimming Pool
Pattern
Flower
Season
Summer Holiday
Age Group
Adults
Gender
Women's
Style
Beachwear
Piece
One-Piece
HS Code
6112410000
Origin
China
02
Product Showcase
Material Nylon, Elastane
Feature Easy to dry, Suitable for beach and party
OEM&ODM Accept custom design and labels
Payment Terms Western Union, Paypal, T/T, L/C, D/P
Our Advantages
  • Over 20 years of experience in swimwear manufacturing
  • Production capacity up to 2.5 million pcs/year
  • Professional QA & QC team and technician team
  • Plants certified by BSCI, SEDEX, and GRS
03
Packaging & Delivery
Package Size
37.00cm * 34.00cm * 0.80cm
Gross Weight
0.300kg
Frequently Asked Questions
Are you a professional manufacturer or a trading company?
We are a professional swimwear manufacturer with over 20 years of experience, operating production plants with a total capacity of up to 2.5 million pieces per year.
Can you handle custom designs and branding?
Yes, we provide both OEM and ODM services. We can develop samples based on your tech packs or choice from our annual collection of over 100 designs, adding your own logos and labels.
What is your minimum order quantity (MOQ)?
Our standard MOQ for swimwear is 100 pieces per style per color, which can include 3-4 different sizes.
How long does it take to develop a sample?
Typically, it takes about 7-10 days for fabric production and another 7-10 days for sampling. If existing fabric is used, the process is significantly faster.
How do you ensure the quality of bulk production?
We prepare pre-production samples (PPS) and hold meetings with our production lines before starting. Our QC team performs both inline and final inspections, and we welcome third-party inspectors.
What is the typical lead time for bulk orders?
During the low season (April to Sept.), lead time is 60-90 days. During peak season (Oct. to Mar.), it ranges from 90-120 days, including material production.

Related Products